MINERAL INVESTIGATION
Project :1 Investigation of coal in Kalya–dung area near Bokulia Town of Karbi-Anglong district Toposheet No.83G/1.Quantum of work to be done:
| Nature of work. | Target |
|---|---|
| i. Preliminary Geological Mapping (Scale 1:25000) | 20 Sq. Km. |
| ii. Detailed Geological Mapping with contouring (Scale 1:2000) | 2 Sq. Km. |
| iii. Drilling | 200 Meters. |
| iv. Sampling | As per requirement.. |
Project :2 Investigation of coal in Sarpo Teron Gaon & Laldera Nepali Basti area near Manja, Karbi-Anglong district under promotional exploration of coal Toposheet No.83G/9.Quantum of work to be done:
| Nature of work. | Target |
|---|---|
| i. Preliminary Geological Mapping (Scale 1:25000) | 20 Sq. Km. |
| ii. Detailed Geological Mapping with contouring (Scale 1:2000) | 2 Sq. Km. |
| iii. Drilling | 300 Meters. |
| iv. Sampling | As per requirement.. |
Project : 3 Investigation of placer gold in the Subansiri and its tributaries in Lakhimpur district. Toposheet No. 83 I/6, I/7.Quantum of work to be done:
| Nature of work. | Target |
|---|---|
| i. Preliminary Geological Mapping (Scale 1:12,500)) | 80 Sq. Km. |
| ii. Sampling | i.Bed Rock sampling -100 Nos.. ii Soil Sampling -100 Nos. iii. Stream sampling -100 Nos iv. Pitting/Trenching -100 Nos. |
Project : 4 Investigation of Limestone at Burahungdung area near Umrangso, Dima Hasao district. Toposheet No- 83 C/11.Quantum of work to be done:
| Nature of work | Target |
|---|---|
| i. Preliminary Geological Mapping, (Scale-1:25000) | 10 Sq.Km |
| ii. Detailed Geological Mapping with contouring (Scale-1:2000) | 1 Sq.Km |
| iii. Sampling | As per requirement |
Project : 5 Extensive study and detailed mapping of Dimensional stones in Ajagarh hills in Goalpara District. Toposheet No.78 J/12.Quantum of work to be done:
| Nature of work | Target |
|---|---|
| i. Preliminary Investigation (Scale 1:50,000) | 400 Sq.Km. |
| ii. Detail Geological Mapping (Scale 1:2000) | 1.5 Sq.Km. |
| iii. Sampling | As per requirement |
Project : 6 Investigation of Clay deposit at Bogamati in Baksa District near Assam (India) Bhutan international border.
Toposheet No : Toposheet not available.Quantum of work to be done:
| Nature of work | Target |
|---|---|
| i. Preliminary Geological Mapping (Scale-1:25,000) | 5 Sq. Km |
| ii. Detailed Mapping with contouring (Scale 1:2000) | 2 sq.Km |
| iii. Sampling: pitting and trenching | As per requirement |
Special Project-1
Inspection of Mining lease area
The Directorate has proposed for inspection of all mining lease areas to verify whether the proper implementation of the lease conditions are made or not.
| Title | Size | Detail |
|---|---|---|
| Schemes (2017-2018) | 202.59 KB |